A 'tite quick photo with the phone (we loaned AFN to cover a happy event , Enzo welcome:) ). The wall above the staircase is the first ROC-plated Finally, everything went well (no hyper snug but hey, you chew). Next step, a wall in the lounge and double ... 3km to seal ..... : /
Tuesday, September 11, 2007
Monday, September 3, 2007
How Long Does It Take At The Meps
Comeback
: THANKS TO ALL AND ALL for your mail and your coms (and even anonymous impatient eh Siya!;)) That made us really happy to see that even when we say nothing you still go for news, so thank you again the z'amis miles:)))
Whaa dust here is worse than ours!
Well, after all this time, you've all seen that we had a beautiful stained glass? It is one
Finally some ptits stuff to tell:) Nothing to marvel
not eh, it just gives them.
We confess, in 7 months was not fucking with nothing fucked up, but then nothing (well at work because, otherwise, it was full of cool stuff but do not advance the Schmilblick).
So I said, it was quietly taken the last weekend, with the program:
-Estelle, installation of new outlets which operate on the entire plateau (yes!!) And the perennial sanding of the beam above the mezzanine (with harness and climbing cow, it's safer)
-for me, a lil shot mechanic with the rails of the future septum above the ground floor staircase-1 (with nothing in a vacuum, on tiptoe at the top of the scale, it is less conservative) and the end of the hopper of the mezzanine.
For once, it went well, the beam starts to look good and the wall is straight (better!) and ready to be isolated. It was reasoned that because once finished wall (...) we will finally put a staircase! Because there ... fed scales dangerous at night ...
Those are all small news, normally we're back and we'll have more stuff soon to tell :) PS Well, after all this time, you've all seen that we had a beautiful stained glass? It is one
Finally some ptits stuff to tell:) Nothing to marvel
not eh, it just gives them.
We confess, in 7 months was not fucking with nothing fucked up, but then nothing (well at work because, otherwise, it was full of cool stuff but do not advance the Schmilblick).
So I said, it was quietly taken the last weekend, with the program:
-Estelle, installation of new outlets which operate on the entire plateau (yes!!) And the perennial sanding of the beam above the mezzanine (with harness and climbing cow, it's safer) -for me, a lil shot mechanic with the rails of the future septum above the ground floor staircase-1 (with nothing in a vacuum, on tiptoe at the top of the scale, it is less conservative) and the end of the hopper of the mezzanine.
For once, it went well, the beam starts to look good and the wall is straight (better!) and ready to be isolated. It was reasoned that because once finished wall (...) we will finally put a staircase! Because there ... fed scales dangerous at night ... : THANKS TO ALL AND ALL for your mail and your coms (and even anonymous impatient eh Siya!;)) That made us really happy to see that even when we say nothing you still go for news, so thank you again the z'amis miles:)))
Sunday, February 11, 2007
Gemmy Holiday Light Show Tree Not Working
Vitrail: 8th episode - End of 1st season
Today ... end of the window!
First, smoothing the overlap areas: using a mini-spatula to fully retract the seals and crush one just above. After using a kind of plastic spoon to fold the wing of lead glass. The gesture must be flexible and smoothly. We finished preparing the pellets by brushing for thorough cleaning (dust lead glop = no: (next time I'll put a mask).
Then we prepare the welds. We put the brush "fat degreaser" (yes, I swear, it works, but I have not understood the trick ...) taking care of the well to penetrate between the wings that overlap. It's funny, fat dry cleaner in the lead ( grease dries?! really not understood the trick ...). Then Yapluka welding rods with large tin. I even states that where there was no aa fat, tin HOOK not. I'm not super-proud of my welds ... but hey it is not clear. Not hot enough it sticks the wand, it burns too hot lead, tin is not quite fragile, it is too big pate, patouille is dull and brittle ... Brief must be right first time!
Finally, the last weld. Now go back the window, but then very gently. And this post is taken from the beginning ... (Unless you've already read this sentence) And oh
victory was over! ... Well almost ...
just returned, Yann has been searched the small window. And second victory in the window returns the site! 1 mm less in width and 5 mm in height. As a black tape on the edges of the glass to have no light passing around the edges.
For fixing, we opted for making small spikes on the edges of the window, folded around the edge of the window. It is.
We raced the sun to see what it looked like ... but it was he who won
Click on the images! (The blue sky is an effect of the glass is white!)
PS: for orders, no delivery expected before 2012, given the number of things I already do to;)
Re PS: Thanks for all your comments, it's nice ...
First, smoothing the overlap areas: using a mini-spatula to fully retract the seals and crush one just above. After using a kind of plastic spoon to fold the wing of lead glass. The gesture must be flexible and smoothly. We finished preparing the pellets by brushing for thorough cleaning (dust lead glop = no: (next time I'll put a mask).
Then we prepare the welds. We put the brush "fat degreaser" (yes, I swear, it works, but I have not understood the trick ...) taking care of the well to penetrate between the wings that overlap. It's funny, fat dry cleaner in the lead ( grease dries?! really not understood the trick ...). Then Yapluka welding rods with large tin. I even states that where there was no aa fat, tin HOOK not. I'm not super-proud of my welds ... but hey it is not clear. Not hot enough it sticks the wand, it burns too hot lead, tin is not quite fragile, it is too big pate, patouille is dull and brittle ... Brief must be right first time! Finally, the last weld. Now go back the window, but then very gently. And this post is taken from the beginning ... (Unless you've already read this sentence) And oh
victory was over! ... Well almost ...
just returned, Yann has been searched the small window. And second victory in the window returns the site! 1 mm less in width and 5 mm in height. As a black tape on the edges of the glass to have no light passing around the edges.
For fixing, we opted for making small spikes on the edges of the window, folded around the edge of the window. It is.
We raced the sun to see what it looked like ... but it was he who won
Click on the images! (The blue sky is an effect of the glass is white!)
PS: for orders, no delivery expected before 2012, given the number of things I already do to;)
Re PS: Thanks for all your comments, it's nice ...
Monday, February 5, 2007
Can Foot Drop Cause Edema
Vitrail - Episode 7
Next week, beating and smoothing weights, then fitting the oil degreaser (not including the shot of the fat that removes grease), and welding this side. Then turning over (will have to be careful) and welding the other side. And finally fitting and admirage!
's it's over!
No, actually it's not true ... During more than I promise you my love! I've already talked about the next windows? ... Oops j'vous tell you later. And as
are 2 lame bored to their PC or Mac;) I will detail all you!
No, actually it's not true ... During more than I promise you my love! I've already talked about the next windows? ... Oops j'vous tell you later. And as
are 2 lame bored to their PC or Mac;) I will detail all you!
The implementation lead is complete. I find it much harder than the cutting of glass. We must measure properly prepare the pellets, which must be open and crush them to other places (but not too much because the glass must still return it). We must be careful tracking, and order of laying bits of glass to keep the stained glass. It must be said that if not maintained ... while on the lam (hence the small nails to hold the As). In short, not easy.
All this to realize that my last piece did not fit into the slot, then forced to "relax" the window (with the risk that a glass so the "throat" of lead or a lead sort of another in which it was made), to slide my last end. After
is closed with two strips of lead and fixed a clipboard to hold the assembly. Then taking measurements, 32.3 on one side, 32.5 on the other ... not good, then we unpins the board and he tapped with a mallet (not afraid) to "settle" the window.
When it's good, we nailed the board, it will move over to the welds.
is closed with two strips of lead and fixed a clipboard to hold the assembly. Then taking measurements, 32.3 on one side, 32.5 on the other ... not good, then we unpins the board and he tapped with a mallet (not afraid) to "settle" the window.
When it's good, we nailed the board, it will move over to the welds.
Subscribe to:
Posts (Atom)