Hi all, bloggers z'amis z'et readers (bloggers z'amies z'et readers also obviously) (... especially well ^ ^)
Since the last post, there is no stubble. As we are motivated, we take advantage of: the doubling of the living room wall (the side pantry) is completed, Estelle began to build on the elec and we have a multitude of sockets and switches that work. There's even lights that light that we should proceed without the strip. The large class what! Listed
plasterboard joints, the 1st pass (+ tape) is made almost everywhere, is more than the 2 mega-horizontal stripes on the 1st floor, my electric plane having died during I was digging the groove ... It was not made for? really?
Besides if someone has a good tip before it is the grinder that ramassse, I'ma taker ...
Here for the latest news is not bad.
As this month it's been 3 years since the adventure began, I wanted to do a big post a point on the progress of work (or non-advanced, it depends).
Remember, at first, after 2-3 sledgehammer, it was like this:
Ground floor lounge: was poured screed, lined and insulated 3 of 4 walls, electrified all (for walls clad ...), extended the chimney and installed a wood stove.
That leaves a wall plate, a small cupboard to wall-off the entrance to the tile in place, strip and stain the door to the garden and put a staircase to the first.
ground floor kitchen-room-WC: cooking studio has served as a first step. It is in ruins, must redo everything, there's leaks, no elec and is below the ceiling so the barn is blown to pieces as soon as we attack this part of the house. Will redo the drainage of water, a fork-patching, put the tile and implement a kitchen and toilet, shower mount a floor ...
Since the last post, there is no stubble. As we are motivated, we take advantage of: the doubling of the living room wall (the side pantry) is completed, Estelle began to build on the elec and we have a multitude of sockets and switches that work. There's even lights that light that we should proceed without the strip. The large class what! Listed
plasterboard joints, the 1st pass (+ tape) is made almost everywhere, is more than the 2 mega-horizontal stripes on the 1st floor, my electric plane having died during I was digging the groove ... It was not made for? really?
Besides if someone has a good tip before it is the grinder that ramassse, I'ma taker ...
Here for the latest news is not bad.
As this month it's been 3 years since the adventure began, I wanted to do a big post
Remember, at first, after 2-3 sledgehammer, it was like this:
Ground floor lounge: was poured screed, lined and insulated 3 of 4 walls, electrified all (for walls clad ...), extended the chimney and installed a wood stove.
That leaves a wall plate, a small cupboard to wall-off the entrance to the tile in place, strip and stain the door to the garden and put a staircase to the first.
ground floor kitchen-room-WC: cooking studio has served as a first step. It is in ruins, must redo everything, there's leaks, no elec and is below the ceiling so the barn is blown to pieces as soon as we attack this part of the house. Will redo the drainage of water, a fork-patching, put the tile and implement a kitchen and toilet, shower mount a floor ...
no photos for now
ground floor storeroom: insulated ceiling, elec OK but walls and floor in the state to disburse land ... one day ...
ground floor garage in the state, maybe one day my studio? currently full bazarre, pavers, furniture, old doors and windows, props builder, former boiler + tank ... Brief inaccessible when something is in the garage, we do not ...
no photos for now
ground floor garden nothing is done, it maintains the best
1st floor guest room: was all redone from floor to ceiling, the room is complete (except the bars of the window and the niche that has received this week and are currently under glaze) and is currently our bedroom.
the picture a bit dated, since y 'curtains, carpets and gadgets to decorate ... see Miss for more info:)
1st +2 nd floor plate floor mezzanine : Ground OK (chestnut beams, joists and flooring), 3 of 4 walls of plywood (the 4th is on hold, we expect the builder to make an opening toward the barn), electricity OK on the 3 walls, insulation and ceiling panels OK too:)
remains a wall plate, the opening to the barn to putting the stairs to the mezzanine, put the toilet underneath the floor sanding and vitrify
first floor barn yard not started, will redo the floors, double walls, insulation and wainscot (?) the ceiling, creating a bathroom, bedroom, and if possible a mini loft above the bathroom to tidy the mess ... Briefly, to
no photos for now
2nd floor attic: we redid the floor (beams, joists and CTBH), isolated and plated ceiling, lined the walls ... Briefly, this is the second part really finished with the guest room.
completed ... for an attic, if it should become a bedroom, will still put a laminate floor finishes and refine ...
Here for the inventory, good in three years, there's been a hard fact but it was still not trampled. As against this is still not sick of living in the dust Permanent or having them put the weekend, it has not made great sores (as long as it lasts), so far, so good, better and even better! :)
Oh yes, we should also redo the facade in a few months and the door is almost ordered, but that's the one we will po ^ ^
... In any case it is not about closing the blog: D